I went to check on the latest progress, and I think I can say that they have progressed well. Mainly there is just the section between Fariones Hotel and Calle Doramas of the main works to finish. Its a distance of approxiately 380 metres. The main holes and pipeworks are finished and it is close to laying the tarmac finish. With the Carnival due to be on Saturday 28th February then it seems that they will make the date.
I have shown a map with the positons of the pictures shown on it, to give you an idea of how it is progressing.
The section from Calle Doramas to CC Atlantico is almost complete with only the finishing coat of Tarmac and minor finishings to the pavements (tree planting etc)
The Rest of the works from CC Atlantico, which is open to traffic, along to the end of the present stage is virually finished apart from some minor paving details.

Map showing positions of the shots.

1) Pavements almost complete

2) View From The Fariones Hotel End

3) View 30m before Calle Guanapay (Cardiac Hill)

4) View at Calle Guanapay

5) View 30 metres after Guanapay

6) View 75 Metres after Guanapay

7) View looking back at 90 Metres after Guanapay

8) View 90 metres after Guanapay

9) View Looking across to Los Cocoteros

10) View Across to the Spanish Inn

11) 80 metres Before Calle Doramas

12) View at the end of Works at Calle Doramas

13) View showing Road almost complete from Calle Doramas

14) View of road stretching along to CC Atlantico, just the final layer of tarmac and some trees.